A project carried through

One brief, sixteen steps, and the decisions at each — including two that changed the answer.

Lesson review: expert verification remains open

This lesson has received a full-context editorial review and a check of its technical explanations. Selected arithmetic has been checked separately. This is not independent engineering sign-off.

Checks needed for project use

  • A computational engineering reviewer must check algorithms, convergence claims, statistical assumptions and numerical examples beyond the cases explicitly recorded.
  • Independent engineering review of capstone assumptions, service coordination, fire/acoustic requirements, structural scheme feasibility and whole-life carbon methodology remains required. Illustrative calculations do not establish a project recommendation.

These are educational models and exercises. Check their assumptions before using the results. The full technical content and every diagram have not yet been independently verified.

Concrete and steel calculations retain their stated first-generation Eurocode teaching basis. Use the standards and amendments specified for your project; do not mix generations without an appropriate design basis.

Read the lesson register and outstanding review notes

Why this matters

The sequence is easier to agree with than to follow. This lesson works one fictional project through it end to end, so the steps have content rather than titles — and so the two places where the process changed the answer are visible.

By the end of this lesson you should be able to

  • Follow a complete worked project through the sequence
  • See how each choice narrows the next
  • Identify where the process changed the outcome
  • Read a recommendation written to be argued with

The brief

A six-storey office with 8 000 m² total gross floor area. The architect proposes a 12 m column-free grid for letting flexibility. The client has committed publicly to an embodied-carbon target. The floor zone is agreed at 1 100 mm including services. Advise on the structural scheme.

Everything below is fictional and is worked with this course's own libraries.

Steps 1 to 4 — before any model

1. Problem definition. Which structural scheme meets the brief at the lowest embodied carbon, within the agreed floor zone, and what does the grid choice cost?

Note the second clause. The brief asked about the scheme; the question asks about the grid too, because Module 20 established that the grid is a decision of comparable size and it was about to be settled without a number.

2. Concept options. Four genuinely different families: composite steel, concrete flat slab, concrete band beam, CLT and glulam hybrid.

3. Parametric variables. Grid span 6 to 12 m (varying); scheme (varying); floor area and storeys (fixed by the brief); carbon factors (uncertain, to be tested).

4. Digital workflow. Rate-based comparison at this stage — no model. A model is not built until step 9 and only for the scheme that survives.

Steps 5 to 8 — deciding the model

5. Model strategy. None yet. The scheme question is answered on rates, and a model would be false precision. This is a legitimate answer to step 5 and it is worth saying explicitly rather than by omission.

6, 7. Elements and solver. Deferred with the model.

8. Prediction. Written before anything is computed:

  • Timber will have the lowest carbon and the greatest depth.
  • The flat slab will be shallowest and highest-carbon.
  • 12 m will cost roughly 80 % more carbon than 6 m.
  • Steel will be lighter than the concrete options and not lower-carbon.

Steps 12 to 13 — the exploration

At 12 m, the depths are: flat slab 414 mm, band beam 482 mm, CLT 600 mm, composite steel 600 mm.

Against a 1 100 mm zone including services, all four fit — but the timber and steel options leave only 500 mm for services across the whole floor, which is tight for a 12 m span. Flagged, not resolved: it needs the services engineer.

Carbon at 12 m tells the story the prediction expected, and one thing it did not. At a 9 m grid the four schemes come out at CLT 447, band beam 666, composite steel 782 and flat slab 866 tCO₂e — and the steel frame is lighter than the band beam and carries more carbon, which was predicted, and is worth having predicted.

The grid comparison: doubling the span from 6 m to 12 m costs the steel scheme 83 % more carbon (562 → 1 028 tCO₂e). The prediction said roughly 80 %.

Robustness. Perturbing every carbon factor by ±30 %, one at a time, does not change the winner. This shows stability in those single-factor trials only. The factors, quantities, joint scenarios and exclusions still require review before a project recommendation.

Step 14 — AI-use assessment

Three candidate uses, assessed against Module 18's rule:

  • Predicting scheme carbon from past projects — no. A rate-based deterministic calculation exists, is transparent, and is what was used.
  • Suggesting a starting grid from comparable buildings — defensible as a recommendation to a human, with the deterministic comparison run afterwards. Not used here; the four-scheme sweep was cheaper.
  • Screening the completed model for unusual warnings — yes, later, at step 9, with a human reviewing the output.

Steps 15 to 16 — record and recommendation

Provisional teaching conclusion. Investigate the CLT and glulam hybrid at a 9 m grid alongside the other viable options. This illustrative calculation is not sufficient to select a real project scheme.

On what evidence. At 9 m, the illustrative CLT total of 447 tCO₂e is 32.9% below the band beam total of 666; the latter is 49.0% higher than the former. The winner is unchanged in the stated single-factor trials. For the steel scheme, reducing the grid from 12 m to 9 m changes 1 028 to 782 tCO₂e, a 23.9% reduction. This percentage must not be transferred to CLT without its own calculation.

What it depends on. That 9 m is acceptable for letting; that services fit the nominal 635 mm remaining at the 9 m CLT depth of 465 mm; that a timber supply chain can be secured early; and that the carbon accounting excludes sequestration, which is the conservative choice and is stated.

What would change it. Verified factors showing the timber figure materially higher; a letting requirement that genuinely needs 12 m; or a fire or acoustic constraint that rules out exposed timber.

What is excluded. Foundations and substructure — whose effect needs separate assessment of ground conditions, actions and foundation design. Cost. Programme.

Worked example

Where the process changed the answer

Given

  • The project above, worked through the sixteen steps
  • The brief as received asked only about the scheme
  • The prediction was written at step 8, before anything was computed

Find

The two points at which following the sequence changed the outcome

    Practice

    A steel scheme produces 1 028 tCO₂e at a 12 m grid. Moving to 9 m brings it to 782. What percentage of the frame carbon does the grid change save?

    Practice

    At a 12 m grid a CLT scheme is 600 mm deep and the agreed floor zone is 1 100 mm. How much depth is left for services, in millimetres?

    Summary

    • Testing the grid widened the comparison and identified a 23.9% reduction in the illustrative steel example
    • The prediction turned a counter-intuitive result into an expected one
    • A scheme comparison at concept stage needs no model, and saying so is a legitimate step-5 answer
    • Flag what belongs to another discipline rather than resolving or ignoring it
    • State what the recommendation depends on and what would change it